Image: 360 - Witham New Build Project
The groundworks commence with the digging of an 8 cubic metre soakaway. The bad weather caused the trench to collapse before we could get the concrete in so it had to be re-dug. All is well now though and the groundworks are progressing on schedule.
 
 
Back to imageClose this window